Phase I Corridor Environmental Site Assessments
The City of Indianapolis undertook a comprehensive reconstruction project to modify the alignment of Harding Street, requiring the environmental assessment of 13 commercial properties between Raymond Street and Interstate I70 near downtown Indianapolis. Mundell completed Phase I and Phase II site assessment activities resulting in construction occuring on time and several industrial and commercial properties being were cleaned up……Read More »
Indoor Air Sampling and Mitigation – Chlorinated Solvent Plume
Mundell conducted air sampling a commercial facility in to determine if the groundwater impacts had resulted in degradation of indoor air quality within the existing site building……Read More »
Risk Assessment – Vapor Intrusion from an off-Site Industrial Chlorinated Solvent Plume
Risk evaluations pointed toward the potential for indoor air VOC concerns associated with a chlorinated solvent groundwater plume from an industrial facility, requiring ongoing study and plume monitoring. The evaluation was utilized by plaintiffs in the proceedings for a legal settlement of the case……Read More »
Particle Tracking, Solute Transport Model Used to Evaluate Threat of TCE Impacted Groundwater to Human Health and the Environment
Mundell performed 3D analytical modeling of an impacted groundwater plume at a former manufacturing facility to evaluate aquifer characteristics and to forecast probable contaminant migration extents……Read More »